Early DevelopmentStandalone BESS
Atlantic Gateway BESS
Atlantic Seaboard
Northeast, USA
Expected COD: 2030
Project Overview
A grid-scale battery storage facility positioned to serve the rapidly evolving Northeast power markets and support the growing influx of offshore wind generation along the Atlantic Seaboard. The project targets critical transmission interconnection points designed to absorb offshore renewable energy and dispatch it during peak demand periods.
Project Highlights
- 300 MW / 1,200 MWh utility-scale battery storage
- Designed to integrate Atlantic offshore wind generation
- Positioned at critical Northeast transmission hub
- Supports state offshore wind mandates and RPS targets
- Site studies and landowner discussions active
- Long-duration storage architecture under evaluation
BESSNortheastOffshore Wind IntegrationEarly DevelopmentGrid-Scale
Capacity Summary
Storage Power
300 MWStorage Energy
1200 MWhRegion
Northeast, USACountry
United StatesExpected COD
2030Interested in this project?
Contact our development team to learn about offtake, co-development, or landowner partnership opportunities.