Early DevelopmentStandalone BESS

Atlantic Gateway BESS

Atlantic Seaboard
Northeast, USA
Expected COD: 2030

Project Overview

A grid-scale battery storage facility positioned to serve the rapidly evolving Northeast power markets and support the growing influx of offshore wind generation along the Atlantic Seaboard. The project targets critical transmission interconnection points designed to absorb offshore renewable energy and dispatch it during peak demand periods.

Project Highlights

  • 300 MW / 1,200 MWh utility-scale battery storage
  • Designed to integrate Atlantic offshore wind generation
  • Positioned at critical Northeast transmission hub
  • Supports state offshore wind mandates and RPS targets
  • Site studies and landowner discussions active
  • Long-duration storage architecture under evaluation
BESSNortheastOffshore Wind IntegrationEarly DevelopmentGrid-Scale

Capacity Summary

Storage Power
300 MW
Storage Energy
1200 MWh
Region
Northeast, USA
Country
United States
Expected COD
2030

Interested in this project?

Contact our development team to learn about offtake, co-development, or landowner partnership opportunities.

Contact Our Team