PermittingStandalone BESS
Northern Corridor BESS
Northern Industrial Corridor
Great Lakes Region, USA
Expected COD: 2027
Project Overview
A strategic standalone battery energy storage asset positioned in a high-growth industrial corridor with critical grid support needs. Designed to capture value across multiple revenue streams including capacity markets, ancillary services, and energy arbitrage, with a direct path to interconnection in a key regional transmission load zone.
Project Highlights
- 150 MW / 600 MWh standalone battery storage
- Located adjacent to high-load industrial corridor
- Multiple revenue stack: capacity, ancillary services, arbitrage
- Interconnection queue position secured
- County permitting application submitted
- 4-hour duration storage with modular expansion capability
BESSStandalone StorageGreat LakesPermittingIndustrial
Capacity Summary
Storage Power
150 MWStorage Energy
600 MWhRegion
Great Lakes Region, USACountry
United StatesExpected COD
2027Interested in this project?