PermittingStandalone BESS

Northern Corridor BESS

Northern Industrial Corridor
Great Lakes Region, USA
Expected COD: 2027

Project Overview

A strategic standalone battery energy storage asset positioned in a high-growth industrial corridor with critical grid support needs. Designed to capture value across multiple revenue streams including capacity markets, ancillary services, and energy arbitrage, with a direct path to interconnection in a key regional transmission load zone.

Project Highlights

  • 150 MW / 600 MWh standalone battery storage
  • Located adjacent to high-load industrial corridor
  • Multiple revenue stack: capacity, ancillary services, arbitrage
  • Interconnection queue position secured
  • County permitting application submitted
  • 4-hour duration storage with modular expansion capability
BESSStandalone StorageGreat LakesPermittingIndustrial

Capacity Summary

Storage Power
150 MW
Storage Energy
600 MWh
Region
Great Lakes Region, USA
Country
United States
Expected COD
2027